RetroPie forum home
    • Recent
    • Tags
    • Popular
    • Home
    • Docs
    • Register
    • Login
    Please do not post a support request without first reading and following the advice in https://retropie.org.uk/forum/topic/3/read-this-first

    Can’t change order of systems

    Scheduled Pinned Locked Moved Help and Support
    systemorderproblem
    2 Posts 1 Posters 451 Views
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • B
      Bagel Le Stinky
      last edited by

      Re: Change Order that Systems are Displayed on Home Screen

      I have tried editing es_systems.cfg and I have put it in multiple directories like /opt/retropie/configs/all/emulationstation and /etc/emulationstation but the systems still display in alphabetical order. I am not very experienced on doing anything with the command line but I was able to copy my modified CFG onto the directory in /etc, but emulation station will not display it in the order I put them.

      B 1 Reply Last reply Reply Quote 0
      • B
        Bagel Le Stinky @Bagel Le Stinky
        last edited by

        I fixed the issue, I just had to turn off “sort custom collections and systems” in the game collection settings.

        1 Reply Last reply Reply Quote 0
        • First post
          Last post

        Contributions to the project are always appreciated, so if you would like to support us with a donation you can do so here.

        Hosting provided by Mythic-Beasts. See the Hosting Information page for more information.